2 minutes read
“PLT road connects the three assembly constituencies and these stretches of road are the lifeline of people from several villages like Mirbuk, Pekung, Napit, Runne, Sibut, Yagrung, Mirem, Mikong, Bilat, Ledum, Korang, Tene etc. Hence, this road needs timely renovation and improvement with its quality work”, added Kaling Moyong. However, Moyong has appealed to the general public using this road to cooperate with the road construction workers for smooth and timely construction of the road.
Also Read- Soldier saves boy from drowning in Tawang’s Madhuri Lake
Meanwhile, Tani Taki, EE PWD Pasighat Division along with his other senior officers Hage Pilliya and Gobo Yirang has assured of maintaining quality work on the road and has also assured of getting the work completed before the deadline. “The concerned firm will have to maintain the work quality as per the specification failing which the bill for the work done won’t be paid/released”, assured Tani Taki.
As per PWD Pasighat Division, the details of the work are- improvement of road from Pasighat to Remi (0.00 to 20.00 km), sanction No. & date- PWD-12011/373/2022-Work-PWD/1954 dated 26/07/2022, TS amount-Rs. 2938.79 Lakh, name of contractor- M/s ATW (India) Pvt. Ltd., award No. PA/CON-1/CRIF/PSG/REMI/2022-23/7721-28 dtd. 30/12/2022, award amount- Rs. 22,76,17,534.00 (Twenty two crore seventy six lakh seventeen thousand five hundred thirty four) only, time allowed- 24 months, scope of work-Bituminous concrete road- 19.00 KM (carriage way-5.5 M). As per PWD Pasighat, the present breadth of the road is 3.75 Mtr. but the same road will be broadened to 5.5 Mtr. in its improvement work.