3 minutes read
The student body has also alleged anomalies in the tendering of the project, wherein out of Rs. 1.87 Cr only 1.13 Cr tender was called by the department leaving a gap of Rs. 74 Lakhs. On being questioned of the missing amount as per the total sanctioned funds, the department has no genuine clarification. When asked for their clarification over the allegation of the student body, the WRD AE and JE said that, the location of the natural lakes on the top of the mountain covering slope and steep foot-walk of 3-4 KM makes the supply and transportation of materials like sands, gravels, cement etc difficult.
Arunachal: 7th Economic census of Ziro gets certification from DLCC
“The location of the lakes on the mountain top of Riga village involves head load works, but we had advised the firm, the M/s 3N Enterprises of Boleng, to execute the work properly. The department had kept a certain amount of around Rs. 74 lakhs from the total funds out from the tendering process in order to meet up other unseen works”, said the AE, WRD. However, JE had said that all works were done well and even visiting officials from the ministry just after the completion of work had also appreciated the works.
However, one Tanu Tali from the Riga village, who had worked in the water conservation project as labourer also alleged non-payment of their pending bill till date. “We from Riga village along with many of our people had carried the cements and other materials on head-load upto the project sites even by purchasing water pipes by our own self contribution of Rs. 10,000 from each person. But we haven’t been paid the full amount till date. So, we strongly appeal to the state government to make a ground investigation of the project and all guilty officials be booked and arrested”, added Tanu Tali.
Arunachal: Pasighat police seized 44 two wheelers plying on the road without proper number plates
Meanwhile, Magong Banggo Students’ Union has demanded for SIC inquiry into the project so that irregularity in the project execution could be corrected. “We request Chief Minister, Pema Khandu to interfere into the case and get the corruption in the project be investigated properly and guilty be arrested soon so that any developmental projects for the public are not misappropriated by any officials in near future”, said Lenzing Mize and Koti Mize from the student body.
It is important to mention here that Gueng and Diyung Lakes are located in the mountain top of Riga village where there is no road connectivity. The beautiful natural lakes of Gueng and Diyung are a natural source of water which could be developed as a tourist destination. However, due to deforestation in and around the area the lakes are seemingly drying up even during this monsoon season.