1 minute read
“It will take minimum week to restore the entire structure, broken trees and its branches on the poles and the wires has damaged the electrical poles and collapsed the entire transmission system.
Even the main 132 KV Grid Line was badly damaged in between Alo in West Siang and Pasighat in East Siang districts”, informs the power officials.
The cyclone has not only smash up the power scenario but also blockaded roads at various pocket of the district. Uprooting of bamboos, damage of standing crops and houses were also reported.
Meanwhile, it needs to be noted that the blackout in the district has mostly affected the ongoing CBSE and other examinations.