1 minute read
He said that “recently i have discussed with the Highway Chief Engineer Toli Basar about it. I have requested the Executive Engineer concern of Highway Department to prepare detail project report (DPR) for the proper repair and maintenance of the bridge and submit it to the higher authority. I will take up the matter at the highest level soon”.
Dakpe further said that I have inspected the bridge with DC and SP Kamle recently and have written to Chief Secretary for immediate repairing before it collapse and loss of human life takes place.
HELP US TO DELIVER THE INDEPENDENT JOURNALISM